Work

Gestión: one control centre for a studio that was running on three spreadsheets

A management platform for an interior design and decoration studio. Full-stack product design and engineering.

Sector
Interior design and decoration
Region
Spain
Started
2026
Status
Delivered. All 8 sub-projects in production.

Description

Three spreadsheets, one job

The studio's projects were run out of spreadsheets: one for internal cost control, one sent to suppliers for pricing, one shown to the client — the same line items, maintained three times, drifting apart a little more with every renovation.

Gestión replaces all three with one control centre built around how the studio actually works. A project holds rooms; rooms hold elements — windows, wardrobes, custom carpentry — each with a quantity, a unit and a trade. Progress is worked out from the job itself rather than typed in by hand, so it cannot quietly stop matching reality. The studio runs everything from an internal panel; clients get their own space to follow their project.

Status

Where it stands

100% complete

8 sub-projects · 8 in production

Delivered

All eight sub-projects are delivered and in production: the studio panel that runs clients, projects, rooms, elements, phases and photography; the client portal; and catalog, budgeting, purchasing, site tracking, approvals and documents.

How it is built

Four decisions worth naming

Each of the eight sub-projects got a written design before any of it was built. That is deliberate: the studio's process is the hard part, not the software.

Templates are copied, not linked
Creating a project copies the blocks of work it will go through. Editing the template afterwards never rewrites a running or finished job, so the record of how a project was actually run stays intact.
Switching work off is always reversible
Studios turn off blocks that do not apply to a job. Doing so changes nothing underneath, so turning it back on restores exactly the previous state, statuses and all. The simpler alternative would have been impossible to undo.
Progress is worked out, never stored
It is counted fresh each time it is shown, so it cannot go stale. Whether a project is paused or cancelled stays a human decision, not something guessed from a count.
Backups are verified, not assumed
A copy is taken nightly and kept offsite. Weekly, the newest one is restored into a throwaway database and its contents counted. An untested backup is a guess.

See also

Related pages

Contact

Write with the process you want removed.

Roughly how often it runs, and who touches it. That is enough to answer. You get a reply within two working days: either a scope with a fixed price, or a straight explanation of why it isn't a fit and what would be.